BIM delivery

We abandoned flat (2D) design in favour of BIM application at all stages of design. As a result collisions in projects caused by inconsistencies in documentation were reduced by an order of magnitude. Final building information model is used at all stages of the edifice life cycle.

«East Ring» Skolkovo, Moscow

Total area of building: 133 256 m²

Building dimensions: 280 x 280 m

Height of building: 19,5 m

Number of floors: 2-3

Type of structure: insitu concrete + steel

 

BIM models developed:
Architectural model LOD 350
Structural model LOD 300
MEP model LOD 350

Information Model developed for the purpose of:

— identifying mistakes made in design documentation done in AutoCAD.

— re-counting of estimate documentation

Metal structures of «Technopark Skolkovo» Moscow

Total area of building: 266 134 m²

Building dimensions: 334,7 x 280,2 m

Height of building: 53,5 m

Number of floors: 7

Type of structure: Steel

The model of steel constrictions were developed

Information Model developed for the purpose of:

— identifying mistakes made in design documentation done in AutoCAD

— re-counting of estimate documentation

«Renovation of the Polytechnical Museum» Moscow

Total area of building: 48 568m²

Type of structure: all-brick

Developing of the Architectural model

Modeling of the historical building was performed in Revit as per results of laser scanning. The model was created to simplify the further structural design works.