BIM delivery

We abandoned flat (2D) design in favour of BIM application at all stages of design. As a result collisions in projects caused by inconsistencies in documentation were reduced by an order of magnitude. Final building information model is used at all stages of the edifice life cycle.

Construction 4D model for «Technopark Skolkovo» Moscow

Creating with Revit software package a model of technopark of PJSC Sberbank at the innovative centre «Skolkovo»
Model was developed for the purpose of 4D analysis of construction process

-2020-

«Multistory parking utilizing point cloud» Moscow

Creating up to date «as built» BIM model of the object in relation to architectural and structural design sections applying the results of LiDAR laser scan data

-2020-

Form

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

On map

© 2019. All rights reserved. Created by Purple Bear
Close